Dec 04, 2024  
NIACC Catalog 2019-2020 
    
NIACC Catalog 2019-2020 [ARCHIVED CATALOG]

Add to Portfolio (opens a new window)

BMA - 169 Steam Plant Operations II (High Pressure Boilers)


(2 s.h.)

Prerequisite: BMA - 168 Steam Plant Operations I (Low Pressure Boilers)  (Low Pressure Boilers) or permission of instructor.
This course provides an overview of high pressure boiler operations and is used as a preparatory course for the state boiler technician exam. This course has been designated as a pass/no pass course.

Lecture Hours: 30
Lab Hours: 0
Clinical Hours: 0
Work Experience Hours: 0



Add to Portfolio (opens a new window)